
Session 4 of 8
Tool: Deviations from Agency Standards
13 D-B, 16 CM-GC
NCHRP Research Report 939 presents practical guidance for the post-award administration of projects delivered using alternative, nontraditional methods.
Tool: Deviations from Agency Standards (13 D-B, 16 CM-GC)
What is it?
- Deviate from agency standards on a specific project when it makes sense in the context of that project to better meet agency goals
Why use it?
- To better meet an agency’s goals when a specific project context does not match the standard context
- Leverages contractor input for innovation, value, and risk mitigation
Documents
NCHRP ACM Contract Admin – Session 4 Slides