Session 4 of 8

Tool: Plan Standards 

12 D-B, 14 CM-GC

NCHRP Research Report 939 presents practical guidance for the post-award administration of projects delivered using alternative, nontraditional methods.

Tool: Plan Standards (12 D-B, 14 CM-GC)

What is it?

  • Adapting plan standards to the goal of building a project and documenting as-builts instead of for bidding on a project

Why use it?

  • Involving the contractor in the design phase so plan intent is understood and the design phase is expedited
  • Can enhance plan quality

Documents

NCHRP ACM Contract Admin – Session 4 Slides

Useful Links