NCHRP Research Report 939 presents practical guidance for the post-award administration of projects delivered using alternative, nontraditional methods.
Tool: Plan Standards (12 D-B, 14 CM-GC)
What is it?
- Adapting plan standards to the goal of building a project and documenting as-builts instead of for bidding on a project
Why use it?
- Involving the contractor in the design phase so plan intent is understood and the design phase is expedited
- Can enhance plan quality