Session 5 of 8

Tool: In-Progress Design Workshops 

17 D-B, 15 CM-GC

NCHRP Research Report 939 presents practical guidance for the post-award administration of projects delivered using alternative, nontraditional methods.

Tool: In-Progress Design Workshops (17 D-B, 15 CM-GC)

What is it?

  • A meeting requested by the agency or designer to verify the design progress

Why use it?

  • Assists the designer in resolving design issues and questions early
  • Ensures the project team has a consistent understanding of the project assumptions and expectations

How to use it?

  • Request a meeting with ample lead time so the documents can be circulated and reviewed prior to the meeting
  • Create a written record of topics discussed, decisions made, and follow-up actions needed

Documents

NCHRP ACM Contract Admin – Session 5 Slides

Useful Links