
Session 5 of 8
Tool: In-Progress Design WorkshopsÂ
17 D-B, 15 CM-GC
NCHRP Research Report 939 presents practical guidance for the post-award administration of projects delivered using alternative, nontraditional methods.
Tool: In-Progress Design Workshops (17 D-B, 15 CM-GC)
What is it?
- A meeting requested by the agency or designer to verify the design progress
Why use it?
- Assists the designer in resolving design issues and questions early
- Ensures the project team has a consistent understanding of the project assumptions and expectations
How to use it?
- Request a meeting with ample lead time so the documents can be circulated and reviewed prior to the meeting
- Create a written record of topics discussed, decisions made, and follow-up actions needed
Documents
NCHRP ACM Contract Admin – Session 5 Slides